First-of-its-kind testing validates a dynamic phase-switching solution to improve LV network performance and support the transition to net zero.

Key takeaways

Successfully completed first round of PSS testing at PNDC’s Wardpark facility

Demonstrated ability to reduce phase imbalance on LV networks

Improves utilisation of existing cable capacity and defers reinforcement

Reduces network losses and associated CO₂ emissions

Supports increased uptake of EVs, heat pumps and solar PV

The Challenge

The rapid growth of low-carbon technologies such as EV chargers, heat pumps and solar PV is increasing strain on low voltage (LV) distribution networks. Uneven distribution of these loads can lead to phase imbalance, resulting in reduced network efficiency, higher losses, voltage issues, and constraints on customer participation in flexibility services.

The Solution

The Phase Switch System (PSS) is an Ofgem Strategic Innovation Fund (SIF) Beta project led by National Grid Electricity Distribution (NGED), delivered in collaboration with UK Power Networks, Low Carbon Electric, Nortech and PNDC.

The system enables dynamic phase reconfiguration of LV feeder cables, actively balancing loads across phases. By managing phase imbalance, it can:

  • Reduce loading on the most heavily loaded phase, improving fuse performance and network reliability
  • Enhance utilisation of existing infrastructure and defer costly reinforcement
  • Cut losses on the LV feeder, helping to reduce associated CO₂ emissions
  • Lower the likelihood of voltage issues that could limit participation in flexibility services

The project is progressing from Technology Readiness Level (TRL) 6 towards TRL 9, alongside the development of a planning and optimisation tool to support targeted deployment by network operators.

Our Approach

PNDC provided a controlled, full-scale test environment where the PSS could be assessed under realistic network conditions—bridging the gap between lab validation and real-world deployment.

Working closely with project partners, the team supported the validation of the UK Power Networks–specified device, enabling performance to be tested against practical operational scenarios. This approach helps to surface potential issues early, build confidence in the technology, and reduce risk ahead of field deployment.

With testing hosted at PNDC’s Wardpark facility, the project benefits from an environment designed specifically to accelerate innovation—bringing together infrastructure, expertise and industry collaboration in one place.

The next phase will see testing shift to a National Grid Electricity Distribution–specific system, continuing to build evidence for how innovative LV solutions can support a cleaner, more flexible electricity system.

🔗 Find out more:
https://commercial.nationalgrid.co.uk/innovation/projects/phased-switch-system-pss

Collaborative Opportunities
Looking to test and validate your technology with PNDC?
Partner with our team to accelerate development and bring your solution closer to deployment.

Get in touch →

Connect with PNDC’s project lead and senior R&D engineer, Edward Corr on LinkedIn.

 

View all Case Studies